Enhanced logistics and operations of construction sites (IA)
Quick Facts
Email me updates on this grant
Get notified about:
- Deadline changes
- New FAQs & guidance
- Call reopened
- Q&A webinars
We'll only email you about this specific grant. Unsubscribe anytime. No spam.
Ready to Apply?
Get a personalized assessment of your eligibility and application strategy
See in 5 min if you're eligible for Enhanced logistics and operations of construction sites (IA) offering max €48.0M funding💰 Funding Details
Funding Description
Grant Snapshot
* Call Title: Enhanced logistics and operations of construction sites (IA)
* Call Identifier: HORIZON-CL4-2025-05-TWIN-TRANSITION-11-
* Type of Action: Innovation Action (IA) – Lump-Sum Model
* Destination: *Achieving global leadership in climate-neutral, circular and digitised industrial and digital value chains*
* Total Indicative EU Budget (topic level): up to €48 million
* Indicative EU Contribution per Project: €6–10 million (lump-sum)
* TRL at Start / End: ~5 ➜ 7
* Proposal Format: Two-stage, blind evaluation in Stage 1
* Key Deadlines:
* Stage 1: 23 Sep 2025, 17:00 (Brussels)
* Stage 2: 14 Apr 2026, 17:00 (Brussels)
Expected Outcomes
1. 30 % reduction in on-site operational time.
2. Substantial uptake of circular practices (re-use, recycling, de-construction).
3. Quantifiable improvement in workers’ health & safety (fewer incidents, better ergonomics).
Scope Highlights
* Tech-driven optimisation of on-site logistics (traceability, routing, storage, last-metre delivery).
* Seamless interoperability with Digital Twins & BIM ecosystems.
* Human-centric design: Social Science & Humanities (SSH) insights, social innovation, skills development.
* Business case & exploitation strategy mandatory: clear path to market, TRL-7 deployment, links to Net-Zero Industry Act.
* Voluntary contribution to JRC platforms (INCITE, EIGL) encouraged.
Eligibility & Consortium Requirements
* At least three independent legal entities from three different your country and/or Associated Countries.
* China-based entities are NOT eligible in IA projects.
* Strong industrial participation recommended (contractors, tech providers, waste managers, safety equipment SMEs, etc.).
* Synergies with New European Bauhaus, Built4People and Digital Europe Data Spaces will strengthen impact.
Funding Model – Lump Sum
* The EU pays a fixed lump sum linked to accomplished work packages and milestones – no cost reporting.
* Accurate, realistic lump-sum calculation must be annexed (Excel template provided in the portal).
Evaluation Weights (Stage 2)
1. Impact (50 %) – business case, exploitation & market uptake.
2. Excellence (25 %) – scientific & technological quality.
3. Quality & Efficiency of Implementation (25 %) – consortium, work plan, lump-sum logic.
---
📊 At a Glance
Get Grant Updates
Get notified about:
- Deadline changes
- New FAQs & guidance
- Call reopened
- Q&A webinars
We'll only email you about this specific grant. Unsubscribe anytime. No spam.
🇪🇺 Strategic Advantages
EU-Wide Advantages and Opportunities for "Enhanced logistics and operations of construction sites (IA)"
Executive Summary
The Horizon Europe Innovation Action (IA) call HORIZON-CL4-2025-05-TWIN-TRANSITION-11 offers a unique EU-level platform to digitalise, decarbonise and circularise construction-site logistics. By exploiting the breadth of the EU Single Market, the proposal can accelerate technology uptake, set common standards, and unlock new value chains that would be impossible to reach through purely national initiatives.
---
1. Single Market Access: 450+ Million End-Users & Clients
• Unified demand pool: Construction product manufacturers, contractors and demolition firms operate across 27 Member States. A solution compliant with EU norms instantly addresses a market worth ~€1.4 trillion/year (10% of EU GDP).
• Pan-EU procurement: Large infrastructure owners (e.g. TEN-T corridors, CEF-financed projects) increasingly publish tenders that require BIM-enabled, circular-economy site logistics. Demonstrating compliance under an EU-funded IA is an immediate competitive advantage.
• Free movement of digital services: Under the Digital Services Act and Free Flow of Non-Personal Data Regulation, cloud-based Digital Twin and AI platforms can be commercialised without data-localisation barriers, lowering go-to-market costs.
2. Cross-Border Collaboration & Knowledge Exchange
• Consortia composition: Horizon Europe mandates at least three eligible entities from three different countries; this formalises access to diverse construction traditions (prefabrication in Nordics, on-site cast in South, industrialised refurbishment in Central Europe).
• Living labs across climates & regulations: Demonstrating the solution in, for example, a Nordic cold-weather site, a Mediterranean urban retrofit, and a Central-European infrastructure project de-risks market entry EU-wide.
• Workforce up-skilling: Joint curricula developed under the project can later be scaled via ESF+ or Erasmus+ Blueprint Alliances for Construction, ensuring harmonised skills recognition.
3. Alignment With Core EU Policies
• European Green Deal: The call’s focus on waste prevention and circularity directly supports the EU target to halve residual municipal waste by 2030 and to double the circular material use-rate.
• Digital Europe & Data Spaces: Interoperability with Building and Infrastructure Data Spaces fosters data sovereignty while enabling AI-driven optimisation.
• New European Bauhaus (NEB): The human-centric, aesthetics-inclusive NEB agenda values on-site worker wellbeing and inclusive design—both explicitly requested in the topic.
• Net-Zero Industry Act: Faster, safer, resource-efficient construction logistics are recognised enablers for scaling renewable-energy and net-zero manufacturing assets.
4. Regulatory Harmonisation Advantages
• CE-marking & CPR alignment: Developing traceability modules that speak the common language of the Construction Products Regulation (CPR) eases certification across borders.
• Standardisation pathways: Participation in CEN/TC 442 (BIM) and CEN/TC 350 (Sustainability of construction works) fast-tracks the creation of a European standard for dynamic site-logistics data exchange.
• Health & Safety (OSH) convergence: Embedding EU-OSHA guidelines into digital workflows supports Member States in meeting their Vision Zero strategies, reducing accident-related costs by up to €76 billion annually.
5. Access to Europe’s Innovation Ecosystem
• Digital Innovation Hubs (EDIHs): Test before invest, supercomputing access and skills training can reduce development costs for AI, robotics and photonics modules.
• EIT Communities: EIT Digital, EIT Manufacturing and EIT Urban Mobility can provide venture creation services and late-stage pilots.
• World-class RTOs: Collaboration with Fraunhofer, VTT, TNO or Tecnalia offers state-of-the-art labs for advanced sensing, additive manufacturing and circularity testing.
6. Funding Synergies & Blended Finance
• Connecting Europe Facility (CEF): Demonstrators located on TEN-T or energy grids can seek additional CEF grants for pilot deployment.
• InvestEU & EIB: The exploitation strategy can leverage InvestEU thematic windows to secure growth capital post-project, de-risked by the Horizon Europe track-record.
• European Regional Development Fund (ERDF): Regional authorities may co-finance the rollout of project outcomes in smart-specialisation areas (S3) focused on construction 4.0.
• LIFE Programme: Solutions with measurable waste-reduction KPIs could tap into LIFE Circular Economy sub-calls for scale-up.
7. Scale and Impact Potential
• Replication toolbox: The project can deliver open BIM libraries, API specifications and circularity KPIs that local SMEs can adopt with minimal local customisation.
• Market pull via taxonomy compliance: EU Sustainable Finance Taxonomy requires proof of substantial contribution to circular economy activities—providing a commercial incentive for private developers to adopt outputs EU-wide.
• 0.5–1 year payback: Modelling shows that reducing on-site idle time by 15% and waste by 25% yields ROI within 12 months on mid-size projects, boosting take-up across Member States.
8. Grant-Specific Leverage Points
1. Blind evaluation pilot: Technical merit, not brand recognition, decides funding—an opportunity for high-potential SMEs from cohesion regions to lead work packages.
2. Lump-sum model: Simplified financial management reduces administrative burden, encouraging participation of smaller actors and allowing resources to focus on innovation & deployment.
3. Standard-setting mandate: By indicating intent to contribute to European standards, the consortium can shape future market rules, locking in first-mover advantage.
9. Actionable Recommendations for Applicants
• Form a geographically balanced consortium: Include at least three Member States plus Associated Countries to maximise market insight and evaluation scores.
• Integrate social innovation pilots: Partner with social sciences teams to co-create worker-centric interfaces, aligning with Industry 5.0 principles and NEB values.
• Plan dual circular & digital KPIs: e.g. tons of C&D waste prevented, percentage of materials traced via Digital Product Passports, reduction in near-miss incidents.
• Synchronise with Data Space initiatives: Commit to FAIR data principles and compatibility with upcoming Construction Data Space to future-proof the platform.
• Outline a blended-finance roadmap: Detail how Horizon IA funds de-risk prototypes, how InvestEU growth capital scales them, and how national Recovery & Resilience Plans (RRPs) fund early demand.
---
Conclusion
Only an EU-level vehicle such as Horizon Europe can align 27 regulatory regimes, mobilise a critical mass of data and users, and catalyse investment in interoperable Digital Twin and circular-economy technologies for construction logistics. Leveraging the Single Market, policy alignment, and a synergistic funding landscape, applicants can deliver solutions that scale across borders, set global benchmarks, and propel Europe toward climate-neutral, human-centred and digitalised construction value chains.
🏷️ Keywords
Ready to Apply?
Get a personalized assessment of your eligibility and application strategy
See in 5 min if you're eligible for Enhanced logistics and operations of construction sites (IA) offering max €48.0M funding